{"id":21951,"date":"2019-07-16T16:27:23","date_gmt":"2019-07-16T20:27:23","guid":{"rendered":"https:\/\/certacad.wpenginepowered.com\/?page_id=21951"},"modified":"2021-10-27T09:03:31","modified_gmt":"2021-10-27T13:03:31","slug":"prince2-terms-definitions","status":"publish","type":"page","link":"https:\/\/certificationacademy.com\/resources\/glossary\/prince2-terms-definitions\/","title":{"rendered":"PRINCE2 Terms"},"content":{"rendered":"<h2 style=\"font-weight: 400;\">PRINCE2 Terms &amp; Definitions<\/h2>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">A<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Acceptance Criteria<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A prioritised list of criteria that the final product(s) must meet before the customer will\u00a0accept them; a measurable definition of what must be done for the final product to be acceptable to the customer. They should be defined as part of the Project Brief and agreed between customer and supplier no later than the project initiation stage. They should be documented in the Project Initiation Document.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Activity network<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A flow diagram showing the activities of a plan and their interdependencies. The network shows each activity\u2019s duration, earliest start and finish times, latest start and finish times and float. Also known as \u2018planning network\u2019.\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">See also\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">Critical path.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Baseline<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A snapshot; a position or situation that is recorded. Although the position may be updated later, the baseline remains unchanged and available as a reminder of the original state and as a comparison against the current position. Products that have passed their quality checks and are approved are baselined products.Anything \u2018baselined\u2019 should be under version control in configuration management and \u2018frozen\u2019, i.e. no changes to that version are allowed.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">B<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Benefits<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The positive outcomes, quantified or unquantified, that a project is being undertaken to deliver and that justify the investment.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Benefits realization<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The practice of ensuring that the outcome of a project produces the projected benefits claimed in the Business Case.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Business Case<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">Information that describes the justification for setting up and continuing a PRINCE2 project. It provides the reasons (and answers the question:\u2018Why?\u2019) for the project. An outline Business Case should be in the Project Mandate. Its existence is checked as part of the Project Brief, and a revised, fuller version appears in the Project Initiation Document. It is updated at key points, such as end stage assessments, throughout the project.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">C<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Change authority<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A group to which the Project Board may delegate responsibility for the consideration of Requests for Change.The change authority is given a budget and can approve changes within that budget.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Change budget<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The money allocated to the change authority to be spent on authorised Requests for Change.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Change control<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The procedure to ensure that the processing of all Project Issues is controlled, including submission, analysis and decision making.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Checkpoint<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A team-level, time-driven review of progress, usually involving a meeting.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Checkpoint Report<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A progress report of the information gathered at a checkpoint meeting which is given by a team to the Project Manager and provides reporting data as defined in the Work Package.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Communication Plan<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">Part of the Project Initiation Document describing how the project\u2019s stakeholders and<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">interested parties will be kept informed during the project.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Concession<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">An Off-Specification that is accepted by the Project Board without corrective action.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Configuration audit\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A comparison of the latest version number and status of all products shown in the configuration library records against the information held by the product authors.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Configuration control<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">Configuration control is concerned with physically controlling receipt and issue of products, keeping track of product status, protecting finished products and controlling any changes to them.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Configuration management\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A discipline, normally supported by software tools, that gives management precise control over its assets (for example, the products of a project), covering planning, identification, control, status accounting and verification of the products.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Contingency budget<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The amount of money required to implement a contingency plan. If the Project Board<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">approves a contingency plan, it would normally set aside a contingency budget, which would only be called upon if the contingency plan had to be implemented when the associated risk occurs.\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">See also\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">Contingency plan.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Contingency plan<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A plan that provides details of the measures to be taken if a defined risk should occur.The plan is only implemented if the risk occurs. A contingency plan is prepared where other actions (risk prevention, reduction or transfer) are not possible, too expensive or the current\u00a0view is that the cost of the risk occurring does not sufficiently outweigh the cost of taking avoiding action \u2013 but the risk cannot be simply accepted. The Project Board can see that, should the risk occur, there is a plan of action to counter it. If the Project Board agrees that this is the best form of action, it would put aside a contingency budget, the cost of the contingency plan, only to be used if the risk occurs.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Critical path<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">This is the line connecting the start of an activity network with the final activity in that network through those activities with zero float, i.e. those activities where any delay will delay the time of the entire end date of the plan.There may be more than one such path.The sum of the activity durations on the critical path will determine the end date of the plan.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Customer\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">The person or group who commissioned the work and will benefit from the end results.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Customer\u2019s quality expectations\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A statement from the customer about the quality expected from the final product. This should be obtained during the start-up of a project in\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Preparing a Project Brief\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">(SU4) as an important feed into\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Planning Quality\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">(IP1), where it is matched against the Project Approach and the standards that will need to be applied in order to achieve that quality.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">D<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Daily Log\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A record of jobs to do or to check that others have done, commitments from the author or others, important events, decisions or discussions. A Daily Log should be kept by the Project Manager and any Team Managers.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Deliverable\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">An item that the project has to create as part of the requirements. It may be part of the final outcome or an intermediate element on which one or more subsequent deliverables are dependent. According to the type of project, another name for a deliverable is \u2018product\u2019.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">E<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Earned value analysis\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Earned value analysis is a method for measuring project performance. It indicates how much of the budget should have been spent in view of the amount of work done so far and the task, assignment or resources.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">End Project Report<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A report given by the Project Manager to the Project Board that confirms the handover of all products and provides an updated Business Case and an assessment of how well the project has done against its Project Initiation Document.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">End stage assessment\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">The review by the Project Board and Project Manager of the End Stage Report to decide whether to approve the next Stage Plan (unless the last stage has now been completed). According to the size and criticality of the project, the review may be formal or informal.The approval to proceed should be documented as an important management product.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">End Stage Report\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A report given by the Project Manager to the Project Board at the end of each management stage of the project. This provides information about the project performance during the stage and the project status at stage end.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Exception<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A situation where it can be forecast that there will be a deviation beyond the tolerance levels agreed between the Project Manager and the Project Board (or between the Project Board and corporate or programme management, or between a Team Manager and the Project\u00a0Manager).<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Exception assessment\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">This is a meeting of the Project Board to approve (or reject) an Exception Plan.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Exception Plan\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">This is a plan that often follows an Exception Report.For a Team Plan exception, it covers the period from the present to the end of the Work Package; for a Stage Plan exception, it covers the period from the present to the end of the current stage. If the exception were at a project level, the Project Plan would be replaced.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Exception Report\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Description of the exception situation, its impact, options, recommendation and impact of<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">the recommendation to the Project Board.This report is prepared by the relevant manager to inform the next higher level of management of the situation.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Executive\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">The single individual with overall responsibility for ensuring that a project meets its objectives and delivers the projected benefits.This individual should ensure that the project or programme maintains its business focus, that it has clear authority and that the work, including risks, is actively managed.The Executive is the chairperson of the Project Board, representing the customer, and is the owner of the Business Case.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">F<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Feasibility study\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A feasibility study is an early study of a problem to assess if a solution is feasible.The study will normally scope the problem, identify and explore a number of solutions, and make a<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">recommendation on what action to take.Part of the work in developing options is to calculate an outline Business Case for each as one aspect of comparison.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Follow-on Action Recommendations\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A report that can be used as input to the process of creating a Business Case\/Project Mandate for any follow-on PRINCE2 project and for recording any follow-on instructions covering incomplete products or outstanding Project Issues.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">G<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Gantt chart<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">This is a diagram of a plan\u2019s activities against a time background, showing start and end times and resources required.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Gate review\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A generic term, rather than a PRINCE2 term, meaning a point at the end of a stage or phase where a decision is made whether to continue with the project. In PRINCE2 this would equate to an end stage assessment.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">H<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Highlight Report\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Time-driven report from the Project Manager to the Project Board on stage progress.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">I<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Issue Log\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Contains all Project Issues including Requests for Change raised during the project. Project<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Issues are each allocated a unique number and are filed in the Issue Log under the appropriate status.\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">See also\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">Project Issue.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">L<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Lessons Learned Log\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">An informal collection of good and bad lessons learned about the management and specialist processes and products as the project progresses.At the end of the project, it is formalised and structured into a Lessons Learned Report.\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">See also\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">Lessons Learned Report.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Lessons Learned Report<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">A report that describes the lessons learned in undertaking the project and includes statistics from the quality control of the project\u2019s management products. It is approved by the Project Board and then held centrally for the benefit of future projects.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">O<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Off-Specification\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Something that should be provided by the project, but currently is not (or is forecast not to be) provided.This might be a missing product or a product not meeting its specifications. It is one type of Project Issue.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Operational and maintenance acceptance\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Acceptance by the person\/group who will support the product during its useful life that it is accepted into the operational environment.The format of the acceptance will depend on the product itself \u2013 it could be in the form of an acceptance letter signed by the appropriate authority, or a more complex report detailing the operational and maintenance arrangements that have been put in place.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Outcome\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">The term used to describe the totality of what the project is set up to deliver, consisting of all the specialist products.For example, this could be an installed computer system with trained staff to use it, backed up by new working practices and documentation, a refurbished and equipped building with all the staff moved in and working, or it could be a new product launched with a recruited and trained sales and support team in place.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">P<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Peer review\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Specific reviews of a project or any of its products where personnel from within the organisation and\/or from other organisations carry out an independent assessment of the project.Peer reviews can be done at any point within a project but are often used at stage-end points.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Phase\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A part, section or segment of a project, similar in meaning to a PRINCE2 stage. The key meaning of stage in PRINCE2 terms is the use of management stages, i.e. sections of the project to which the Project Board commits one at a time. A phase might be more connected to a time slice, change of skills required or change of emphasis.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Post-implementation review\u00a0<\/span><\/strong><\/b><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">See\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">Post-project review.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Post-project review\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">One or more reviews held after project closure to determine if the expected benefits have been obtained. Also known as post-implementation review.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">PRINCE2\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A method that supports some selected aspects of project management. The acronym stands for\u00a0<\/span><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">PR<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">ojects\u00a0<\/span><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">IN C<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">ontrolled\u00a0<\/span><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">E<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">nvironments.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">PRINCE2 project\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A project whose product(s) can be defined at its start sufficiently precisely so as to be measurable against predefined metrics and that is managed according to the PRINCE2 method.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Process\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">That which must be done to bring about a particular result in terms of information to be gathered, decisions to be made and results to be achieved.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Producer<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">This role represents the creator(s) of a product that is the subject of a quality review.Typically,\u00a0it will be filled by the person who has produced the product or who has led the teamresponsible.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Product<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Any input to or output from a project. PRINCE2 distinguishes between management products (which are produced as part of the management or quality processes of the project) and specialist products (which are those products that make up the final deliverable). A product may itself be a collection of other products.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Product-based planning\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A four-step technique leading to a comprehensive plan based on creation and delivery of required outputs.The technique considers prerequisite products, quality requirements and the dependencies between products.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Product Breakdown Structure\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A hierarchy of all the products to be produced during a plan.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Product Checklist\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A list of the major products of a plan, plus key dates in their delivery.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Product Description\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A description of a product\u2019s purpose, composition, derivation and quality criteria. It is produced at planning time, as soon as possible after the need for the product is identified.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Product Flow Diagram<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">A diagram showing the sequence of production and interdependencies of the products listed in a Product Breakdown Structure.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Product life span\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">This term is used in this manual to define the total life of a product from the time of the initial idea for the product until it is removed from service. It is likely that there will be many projects affecting the product during its life, such as a feasibility study and development, enhancement or correction projects.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Product Status Account\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A report on the status of products.The required products can be specified by identifier or the part of the project in which they were developed.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Programme<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A portfolio of projects selected, planned and managed in a co-ordinated way.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A temporary organisation that is created for the purpose of delivering one or more business products according to a specified Business Case.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Approach\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A description of the way in which the work of the project is to be approached. For example: Are we building a product from scratch or buying in a product that already exists? Are the technology and products that we can use constrained by decisions taken at programme level?<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Assurance<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">The Project Board\u2019s responsibilities to assure itself that the project is being conducted correctly.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Brief\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A description of what the project is to do; a refined and extended version of the Project<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Mandate, which the Project Board approves and which is input to project initiation.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project closure notification\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Advice from the Project Board to inform all stakeholders and the host location that the project resources can be disbanded and support services, such as space, equipment and access, demobilised. It should indicate a closure date for costs to be charged to the project.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project closure recommendation\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A recommendation prepared by the Project Manager for the Project Board to send as a project closure notification when the board is satisfied that the project can be closed.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Initiation Document (PID)\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A logical document that brings together the key information needed to start the project on a sound basis and to convey that information to all concerned with the project.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Issue<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A term used to cover any concern, query, Request for Change, suggestion or Off- Specification raised during the project.They can be about anything to do with the project.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project life cycle\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">This term is used in this manual to define the period from the start-up of a project to the handover of the finished product to those who will operate and maintain it.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project management<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The planning, monitoring and control of all aspects of a project and the motivation of all those involved in it to achieve the project objectives on time and to the specified cost, quality and performance.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project management team<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">Covers the entire management structure of Project Board, Project Manager, plus any Team Manager, Project Assurance and Project Support roles.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Manager\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">The person given the authority and responsibility to manage the project on a day-to-day basis to deliver the required products within the constraints agreed with the Project Board.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Mandate\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Information created externally to the project that forms the terms of reference and is used to start up the PRINCE2 project.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Plan<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A high-level plan showing the major products of the project, when they will be delivered and at what cost. An initial Project Plan is presented as part of the Project Initiation Document. This is revised as information on actual progress appears. It is a major control document for the Project Board to measure actual progress against expectations.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Quality Plan\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A plan defining the key quality criteria, quality control and audit processes to be applied to project management and specialist work in the PRINCE2 project. It will be part of the text in the Project Initiation Document.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project records<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A collection of all approved management and specialist products and other material, which is necessary to provide an auditable record of the project. Note:This does not include working files.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project start-up notification<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">Advice to the host location that the project is about to start and requesting any required Project Support services.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Support<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">An administrative role in the project management team. Project Support can be in the formof advice and help with project management tools, guidance, administrative services such as filing, and the collection of actual data.The provision of any Project Support on a formal basis is optional.Tasks either need to be done by the Project Manager or delegated to a separate body and this will be driven by the needs of the individual project and Project Manager.A full description of the role can be found in\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project management team roles<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">, Appendix B One support function that must be considered is that of configuration management. Depending on the project size and environment, there may be a need to formalise this and it quickly becomes a task with which the Project Manager cannot cope without support. Details of the Configuration Librarian role can be found in\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project management team roles<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">, Appendix B.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Project Support Office<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A group set up to provide certain administrative services to the Project Manager. Often the group provides its services to many projects in parallel.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Proximity<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0(of risk)\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">Reflects the timing of the risk, i.e. is the threat (or opportunity) stronger at a particular time, does it disappear some time in the future, or does the probability or impact change over time?<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Q<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Quality<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The totality of features and characteristics of a product or service that bear on its ability to satisfy stated needs. Also defined as \u2018fitness for purpose\u2019 or \u2018conforms to requirements\u2019.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Quality Log<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">Contains all planned and completed quality activities.The Quality Log is used by the Project Manager and Project Assurance as part of reviewing progress.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Quality management system<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The complete set of quality standards, procedures and responsibilities for a site or organisation.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Quality review<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A quality review is a quality checking technique with a specific structure, defined roles and procedure designed to ensure a product\u2019s completeness and adherence to standards. The participants are drawn from those with an interest in the product and those with the necessary skills to review its correctness. An example of the checks made by a quality review is: \u2018Does the document match the quality criteria in the Product Description?\u2019<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Quality system<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">See\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">Quality management system.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">R<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Request for Change\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A means of proposing a modification to the current specification of a product. It is one type ofProject Issue.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Requirements\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A description of the user\u2019s needs.\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">See also\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">Specification.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Reviewer\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A person asked to review a product that is the subject of a quality review.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Risk\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Risk can be defined as uncertainty of outcome, whether positive opportunity or negative threat. Every project has risks associated with it. Project management has the task of identifying risks that apply and taking appropriate steps to take advantage of opportunities that may arise and avoid, reduce or react to threats.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Risk Log\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Contains all information about the risks, their analysis, countermeasures and status. Also known as Risk Register.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Risk profile<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">A graphical representation of information normally found in the Risk Log.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Risk register<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">See\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">Risk Log.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Risk tolerance line<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The risk tolerance line is one drawn between risks that can be accepted or for which suitable actions have been planned, and risks that that are considered sufficiently serious to require referral to the next higher level of project authority<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">S<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Senior responsible owner\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">This is not a PRINCE2 term, but is used in many organisations. Its equivalent in PRINCE2 terms would be the \u2018Executive\u2019 role.\u00a0<\/span><i><em style=\"font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">See also\u00a0<\/span><\/em><\/i><span style=\"font-style: inherit; font-weight: inherit;\">Executive.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Senior Supplier<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The Project Board role that provides knowledge and experience of the main discipline(s) involved in the production of the project\u2019s deliverable(s). Represents the supplier interests within the project and provides supplier resources.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Senior User<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The Project Board role accountable for ensuring that user needs are specified correctly and that the solution meets those needs.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Specification\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A detailed statement of what the user wants in terms of products,what these should look like, what they should do and with what they should interface.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Sponsor<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">Not a specific PRINCE2 role but often used to mean the major driving force of a project.May be the equivalent of Executive or corporate\/programme management.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Stage\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">A stage is the section of the project that the Project Manager is managing on behalf of the Project Board at any one time, at the end of which the Project Board wishes to review progress to date, the state of the Project Plan, Business Case and risks, and the next Stage Plan in order to decide whether to continue with the project.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Stakeholders\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">Parties with an interest in the execution and outcome of a project. They would include business streams affected by or dependent on the outcome.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Supplier\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">The group or groups responsible for the supply of the project\u2019s specialist products.\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">Team Manager\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">A role that may be employed by the Project Manager or Senior Supplier to manage the work of project team members.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">T<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Tolerance<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">\u00a0<\/span><span style=\"font-style: inherit; font-weight: inherit;\">The permissible deviation above and below a plan\u2019s estimate of time and cost without escalating the deviation to the next level of management. Separate tolerance figures should be given for time and cost.There may also be tolerance levels for quality, scope, benefit and risk. Tolerance is applied at project, stage and team levels.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">T<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">User(s)\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">The person or group who will use the final deliverable(s) of the project.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">W<\/span><\/strong><\/b><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><b><strong style=\"font-style: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Work Package\u00a0<\/span><\/strong><\/b><span style=\"font-style: inherit; font-weight: inherit;\">The set of information relevant to the creation of one or more products. It will contain a description of the work, the Product Description(s), details of any constraints on production such as time and cost, interfaces, and confirmation of the agreement between the Project Manager and the person or Team Manager who is to implement the Work Package that the work can be done within the constraints.<\/span><\/p>\n<p style=\"font-style: inherit; font-weight: inherit;\"><span style=\"font-style: inherit; font-weight: inherit;\">Search for:<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PRINCE2 Terms &amp; Definitions A Acceptance Criteria\u00a0A prioritised list of criteria that the final product(s) must meet before the customer will\u00a0accept them; a measurable definition of what must be done for the final product to be acceptable to the customer. They should be defined as part of the Project Brief and agreed between customer and [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":21929,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","content-type":"","footnotes":""},"class_list":["post-21951","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/certificationacademy.com\/wp-json\/wp\/v2\/pages\/21951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/certificationacademy.com\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/certificationacademy.com\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/certificationacademy.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/certificationacademy.com\/wp-json\/wp\/v2\/comments?post=21951"}],"version-history":[{"count":0,"href":"https:\/\/certificationacademy.com\/wp-json\/wp\/v2\/pages\/21951\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/certificationacademy.com\/wp-json\/wp\/v2\/pages\/21929"}],"wp:attachment":[{"href":"https:\/\/certificationacademy.com\/wp-json\/wp\/v2\/media?parent=21951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}